Our process

From free quote to switch-on in as little as 6 weeks

We manage every step for you, from design and approvals to installation and switch-on. You don't chase paperwork, and you don't pay a thing until your system is installed.

  • Developer NOC and DEWA Shams Dubai approvals handled for you
  • Installed in just one day, and you don't need to be home
  • AED 0 upfront and 0% finance with our Bill Match program
ClimaSolar installer carrying a solar panel on installation day
1 dayinstallation
AED 0until it's installed
Step by step

Exactly what happens, and when

Five clear steps from your first conversation to your first solar-powered bill. We do the heavy lifting at every stage.

  1. 1

    Free solar assessment

    Day 1

    One of our solar specialists talks through your energy use, reviews your DEWA bill and looks at your roof. We design a system around your home and send you a clear proposal with your estimated savings and payment options, including AED 0 upfront and 0% finance with our Bill Match program.

    Your partShare a recent DEWA bill and a few details about your home.
  2. 2

    Site survey and final design

    Week 1

    Our engineer visits to check your roof space, shading and electrical board, then confirms the final layout and system size. You'll know exactly what's going on your roof before anything is submitted.

    Your partGive us access to the roof for a short visit and approve your final design.
  3. 3

    Developer NOC and DEWA approval

    Weeks 1–4

    We prepare and submit everything: the No Objection Certificate for your community or master developer, and your Shams Dubai application and design approval with DEWA. We follow up with both until you're approved.

    Your partSign the forms we prepare for you. That's it.
  4. 4

    Installation day

    1 day

    Our certified team mounts your panels, installs the inverter and wiring, and tests the full system, all in a single day. Your power may be switched off for around an hour while we connect everything, and we leave your property clean and tidy.

    Your partNothing. You don't need to be home, as long as we can access the property.
  5. 5

    DEWA inspection and switch-on

    Savings start

    We book and attend DEWA's inspection. Once it's approved, DEWA fits your two-way smart meter, we commission the system, and you start generating your own power. Your first payment only starts once installation is complete.

    Your partEnjoy lower bills. We coordinate everything with DEWA.
As little as 6 weeksfrom free quote to switch-on
1 dayon site to install
AED 0to pay until it's installed
Installation day

One day on site, then you're solar powered

Our certified team arrives at a time agreed with you and takes care of everything in a single day. You're welcome to be home, but you don't need to be.

  • Arrival and safety checkThe team arrives, reviews the plan and sets up safely around your home.
  • Mounting and panelsRails are fixed to your roof and the panels are installed and secured.
  • Inverter and wiringThe inverter is installed and connected. Your power may be off for around an hour.
  • Testing and tidy-upWe test the full system, clean up the site and leave everything as we found it.
  • Ready for DEWAWe arrange DEWA's inspection and smart meter so your system can be switched on.
1 dayon site, start to finish
~1 hourwithout power while we connect
No needto be home on the day

Filmed on a ClimaSolar installation in Australia. Same team standards, now in Dubai.

After switch-on

Looked after long after install, and easy to pay for

Going solar shouldn't end at installation, or start with a big bill. Here's how we support you, and how payment works.

Ongoing support and warranties

Your system is built to last for decades, and we're on hand whenever you need us.

30yrsPanel performance warranty
10yrsInverter warranty
15yrsInstallation workmanship
  • Dubai-based supportTalk to our local team on WhatsApp or phone, in your time zone.
  • Warranty claims handled for youIf anything needs attention, we deal with the manufacturer so you don't have to.
  • Cleaning and care adviceDust builds up in the UAE, so we'll advise on a cleaning routine to keep your panels performing at their best.

Simple, flexible payment

No large upfront investment, and no surprises.

AED 0upfront
0%finance available
Our Bill Match program We aim to align your system repayments with what you already spend on electricity, so switching to solar has minimal impact on your monthly budget.
  • Nothing to pay until your installation is complete
  • A clear, fixed quote with no hidden extras
  • Finance options explained in your free consultation
Get My Free Quote

Finance is subject to eligibility and approval.

Process FAQs

Questions about the process?

The things Dubai homeowners ask most before getting started. Anything else, our team is a quick WhatsApp away.

How long do the developer and DEWA approvals take?

It depends on your community and DEWA's workload, but approvals usually take a few weeks. We submit everything and follow up for you, which is why the whole process can take as little as 6 weeks from your free quote to switch-on.

What if my developer or DEWA asks for changes?

It happens occasionally. We update the design or paperwork and resubmit it for you, and we'll keep you posted on anything that affects your system or timeline.

Do I need to be home on installation day?

No. As long as our team can access the property and roof, you don't need to be there. If you'd like to be home, we're always happy to walk you through the system at the end of the day.

Will my power be switched off?

Only briefly. Your power may be off for around an hour while we connect the inverter to your electrical board. We'll let you know when to expect it.

When do I start paying?

Nothing is payable until your installation is complete. With AED 0 upfront and 0% finance through our Bill Match program, your repayments are designed to sit in line with what you already spend on electricity.

Can I add a battery later?

In most cases, yes. Let us know during your consultation if you might want a battery in future, and we'll design your system so it's easy to add one later.

I rent my villa. Can I still go solar?

Yes, with your landlord's written approval, as the owner's consent is needed for the developer and DEWA applications. We're happy to explain how it works to you and your landlord.